For solar, storage and EV contractors in California

Permit packages that are ready to submit, in minutes

ePermit researches what your jurisdiction expects, runs the code calculations, draws the sheets and assembles the PDF your office submits. Solar PV, batteries, service upgrades, subpanels and EV chargers.

14-day free trial · no credit card · English and Spanish

One tool for the whole job

Combine scopes in one project and the package follows: the single-line diagram, the load calculation and the checklist all update together.

Solar PVRemove & reinstallEnergy storageMain panel upgradeSubpanelEV charger
Features

Everything a permit package needs

Built from the plan checker’s point of view: the right sheets, the right calculations, the right notes, and nothing missing.

AHJ requirements, researched for you

Ask for a jurisdiction and ePermit reads its published handouts, ordinances and utility rules, then returns a requirement list with every source cited so you can verify it.

Code calculations, shown step by step

Conductor sizing, the 120 % busbar rule, service load, string sizing, voltage drop, EV circuits and energy-storage checks per the 2025 California Electrical Code, each with its method on the calc sheet.

Drawings generated from your inputs

Cover sheet, site plan, single-line diagram, calculation sheet, label schedule and roof plan render from the project data. No CAD work for standard jobs.

Jurisdiction and utility checklists

Every project carries the submittal checklist for its AHJ and utility, with the items the package already satisfies ticked off automatically.

Equipment catalog with listings

Modules, inverters, batteries, gateways, chargers and load-management devices with their listings and spec sheets, ready to drop into a project. Add your own products in the app or through the API.

Phone intake for the field

Field techs photograph the service, the panel and the roof from a guided phone flow that keeps working offline and syncs when the signal returns.

Narratives and pre-check

Scope narratives and plan notes drafted for you, plus a pre-check that flags what a plan checker would question before you submit.

Built for a team

Roles for office, designers and field techs, two-factor sign-in, an audit log on every change, and English or Spanish per user.

How it works

From address to package in four steps

Most of the work is already done when the project opens: the jurisdiction, the utility and the parcel come from county records.

1

Start the project

Enter the address and the scope. Parcel data and the jurisdiction come from county records, and the AHJ requirements are already attached.

2

Pick the equipment

Choose modules, inverters, batteries and chargers from the catalog, or send a field tech to capture the site on a phone.

3

Review calcs and drawings

Calculations, the single-line diagram, labels and the checklist generate from the inputs. Adjust and regenerate as often as you like.

4

Download and submit

Export the package as one PDF with the sheets in plan-check order and submit it through the jurisdiction’s portal.

Pricing

Simple pricing

Build projects, run the calculations and preview every sheet for free. You pay when you download a clean plan set: per plan set, or with a monthly allowance that brings the price down. Revisions for correction letters are always free.

Pay per plan set

For a shop with a job or two a month.
$69per plan set
your first plan set $49
  • 2 office users, field techs free
  • Pay only for the plan sets you download
  • Remove & reinstall plan set $39
  • AHJ research runs from $15
  • $19 per preliminary design with savings and payback
  • All sheets, catalog, intake and checklists
Start free

Starter

For a one-crew shop.
$149/ month
  • 3 office users, field techs free
  • 5 plan sets a month, then $35 each
  • Remove & reinstall plan set $20
  • 2 AHJ research runs a month
  • Preliminary designs with savings and payback included
  • All sheets, catalog, intake and checklists
Start free trial
Most popular

Pro

For a growing installer.
$399/ month
  • 10 office users, field techs free
  • 20 plan sets a month, then $25 each
  • Remove & reinstall plan set $15
  • 6 AHJ research runs a month
  • Preliminary designs with savings and payback included
  • All sheets, catalog, intake and checklists
Start free trial

Business

For multi-crew operations.
$899/ month
  • 25 office users, field techs free
  • 60 plan sets a month, then $18 each
  • Remove & reinstall plan set $10
  • 15 AHJ research runs a month
  • Preliminary designs with savings and payback included
  • All sheets, catalog, intake and checklists
Start free trial

Enterprise

Custom seats, volume and onboarding.
Custom
  • Unlimited users
  • Unlimited plan sets
  • 50 AHJ research runs a month
  • Preliminary designs with savings and payback included
  • All sheets, catalog, intake and checklists
Talk to us

Need more research?

Research credits never expire and are used after the monthly allowance runs out. Buy them any time from Settings → Billing.

1 credits for $155 credits for $6020 credits for $200

Prices in US dollars. Taxes may apply. Cancel any time from the billing page.

FAQ

Questions

What contractors ask before they start.

What is an AHJ research run?

One run asks ePermit to research a jurisdiction (the AHJ) for a set of scopes. It reads the published handouts, ordinances and utility rules and returns a requirement list with cited sources, which you review and save as the jurisdiction’s profile. The profile is reused by every project in that jurisdiction, so most companies need only a handful of runs.

Does ePermit guarantee that my permit is approved?

No. ePermit produces the package; the licensed contractor remains responsible for the design and the submission. The calculations and research are aids for a qualified person to review, and every number and source is shown so you can check it.

Which jurisdictions are covered?

ePermit ships with a directory of Bay Area jurisdictions and utilities and can research any California jurisdiction on demand. The calculations follow the 2025 California Electrical Code.

Do I need a contractor license number to sign up?

No. Sign up with your company name and email. You can add your license and a signature later; they appear on the cover sheet when present.

Can my field techs use it?

Yes. Field techs sign in on a phone with a one-time link, see only the projects assigned to them and walk through a guided photo intake that works offline.

Can I cancel?

Yes. Plans are month to month or yearly and can be cancelled from the billing page. After a plan ends you move to Pay per plan set: your projects stay, you keep building, and you pay only for the plan sets you download.

Is my data shared with other companies?

No. Each company’s projects, customers, catalog additions and files are isolated. The platform only sees usage totals.

Is ePermit available in Spanish?

Yes. Every user picks English or Spanish. The permit package itself is produced in English, as jurisdictions expect.

Ready for your next permit?

Start a free trial today. The first package takes minutes, not days.

Start free trial